Infrastructure
- ADMINISTRATIVE BLOCK
- HOD BUILDING
- BOILER SECTION
- H1N1 WARD
- OPERATION THEATRE
- OPD BUILDING
- 6 WARDS
- ICU
- DAY CARE
- CANTEEN
- DRIVER SECTION
- PLUMBER SECTION

During covid two DG sets 250 kv three oxygen generation plants one 500 and 1500 another 1000 LPM were installed and are running at present